When: |
25 Apr through 25 Apr 2017 | |
CFP Deadline: |
25 |
|
Where: |
Online Event | United States | |
Website URL: |
http://www.compliance4all.com/control/w_product/~product_id=501205LIVE?channel=mailer&camp=Webinar&AdGroup=brownwalker_Apr_2017_SEO | |
Sponsoring organization: |
Compliance4All | |
Categories: |
Medicine & Health - Medical-Speciality |
Keywords:
Event description:
Overview:
This applied to his logistics system, which another reference depicted as a "continent spanning conveyor," but continuous flow in his factories achieved the same purpose at the manufacturing level. This, and the relatively low inventories carried in the chemical process industries, shows that it is quite possible to go beyond the Theory of Constraints by looking for ways to eliminate variation in processing and material transfer times.
Why should you Attend:
No manufacturing process can work faster than its slowest operation, the constraint or capacity-constraining resource. This carries over into project management where no project can finish more rapidly than the events on its critical path. The implications in manufacturing include longer cycle times and more inventory, both of which make it more difficult to meet customer
demands.
Areas Covered in the Session:
The constraint or capacity-constraining resource (CCR) limits the throughput of a manufacturing...
Read more
Posting date:
01 March 2017 | 199 views
Placement:
Not-featured (How do I make my event featured?)
Flag (Report this event)